Feasibility Study: Addition of 11,000 tpa furfural & 3.8 MW electricity  Project SUMMARY  DATE: 4Q12 – 1Q13  DESCRIPTION/FEATURES: The pentosan content of straw (trash/leaves) is similar to bagasse. However, the lower moisture content of the straw is advantageous for the furfural production. The feasibility was based on a mixed bagasse/straw feed to a bolt-on furfural production […]
 

19.03.2014

k2_items_src_539ae9434274fcaedab8deb6007ffb6b.jpg

Modern Brazilian sugar mills are equipped with trash/leaves separation systems (Image: DalinYebo)

Feasibility Study: Addition of 11,000 tpa furfural & 3.8 MW electricity

 Project SUMMARY

 DATE: 4Q12 – 1Q13

 DESCRIPTION/FEATURES: The pentosan content of straw (trash/leaves) is similar to bagasse. However, the lower moisture content of the straw is advantageous for the furfural production. The feasibility was based on a mixed bagasse/straw feed to a bolt-on furfural production facility.

 OUTCOME: Before tax IRR= 39.1%, with a payback period of less than 3 years.

Background

A 815 tch mill will have excess fibre as a result of increased green cane harvesting. Traditional beneficiation of the fibre would be via co-generation of electricity.

CONFIDENTIAL

DalinYebo is an independent, private company. We work for the exclusive benefit of our clients and detailed information about our work or the client’s affairs remain confidential.

PO Box 2737

Westway Office Park

3635, South Africa

info@dalinyebo.com

+27 87 353 9809

Our site has moved to a new platform. It is functional, but expect the odd 'hiccup' (e.g. there are over 300 links and references that we are busy editing). Please continue to use it and/or submit your details and we'll notify you once all is 100% up and running.

Click here to access our old site.

We have received your request. Thank you.